INSURANCE

The estimate and the job are not the same document.

Restoration contractors lose margin in line items the first estimate missed. The agent compares the job, the photos and the code to the carrier’s scope, and builds the supplement. A person releases it.

After a storm, the crew is on roofs. The paperwork that recovers the rest of the claim is still on a laptop in the truck.

Claim 8821 / hail / roof

Carrier scopeLaminate field, 28 squares
On the roofRidge vent, drip edge, starter
Photos12 attached to the lines
CodeIce barrier, local adoption cited

Supplement drafted. Contractor reviews before it is sent.

Who it is for

Restoration contractors

Storm roofing and mitigation crews in hail markets. Missed line items, code items and photos are assembled into a supplement the carrier can price.

Claims operations

Inbound documents — estimates, photos, invoices — are classified, checked against the policy and queued when something does not match.

Desk adjusters’ support teams

The package is documentation. Negotiation of the claim stays with whoever is licensed to do it.

Start with one workflow.

THE SUPPLEMENT

Estimate against the job

The carrier’s scope is compared with what was on the roof: measurements, photos and the code items the first pass left off.

Supplement pack

Line items, photo references and code citations are written in the format the estimating platform already expects.

Documentation only

The work stays on the estimate. Several states limit who may negotiate a claim. The agent does not argue coverage.

THE CLAIM FILE

Document intake

Photos, invoices and reports are filed to the claim and labeled. The adjuster opens a file, not an inbox.

Mismatch flags

A measurement, a date or a coverage line that does not tie is marked. It is not silently corrected.

Storm surge

Volume spikes after hail. The desk scales for the week of the storm instead of hiring a room of coordinators for a month.

Every result can be checked.

Line item

Photo, measurement and code citation.

Scope gap

What the carrier’s estimate omitted, and where it shows on the job.

Policy

The form and the endorsement the line was checked against.

Release

The person who sent the supplement.

01

Observe

02

Map

03

Build

04

Run

05

Expand

Four to six weeks to the first production workflow, on your documents from day one.

Questions

No. The output is an estimate supplement with evidence. Who may discuss the claim with the carrier depends on the state, and that person stays human.